Thermostatic mixing valve maintenance on a planned programme
TMV Servicing Specialists arranges planned thermostatic mixing valve maintenance for buildings and portfolios across the UK. Instead of booking each visit as it falls due, your valves sit on a programme of tests and services, with each valve's interval set from its own readings.
Planned maintenance for sites with more than a handful of valves
Once a building has more than a few TMVs, keeping track of when each one is due becomes the hard part. Valves commissioned at different dates, tested at different intervals and serviced on different cycles drift out of step, and the record turns into a mix of certificates in folders. A planned programme puts every valve on one schedule so tests and services happen when they should, and the records show it.
It suits care homes, housing providers, schools, hotels, leisure centres, student accommodation and commercial buildings, and anyone managing several sites who wants one approach across them all. The programme does not replace your risk assessment or written scheme; it is the practical way of carrying out what they say about TMVs.
For a single valve or a home, booking a test or service when it is due is usually enough. For a building where nobody yet knows how many valves there are or what state they are in, a survey comes first, because a programme built on an incomplete list will miss valves. Once the list is complete, the programme can start.
What a maintenance programme typically covers
The content of each programme follows your risk assessment, the number of valves and how they behave. These are the usual building blocks.
- A starting list of valvesEvery valve on the programme, with its location, outlet, type and approval. Where this does not exist yet, a survey or register builds it.
- Scheduled in-service testsMixed temperature and fail-safe checks at each valve's interval, with readings compared against its commissioning baseline.
- Intervals set per valveValves that hold within about 1°C can move to around 24-28 weeks between tests; valves that drift more are tested more often. Intervals are reviewed as readings come in.
- Periodic servicingStrainer cleaning and checks, at least annually or as your risk assessment directs, plus fuller servicing of cartridges and check valves where readings or age suggest it.
- Visits grouped by siteValves due around the same time are tested in one visit, to keep disruption and repeat call-outs down.
- Forward scheduleA look-ahead of which valves are due and when, so site managers can plan access to rooms and occupied areas.
- Records per visitBefore and after readings per valve, fail-safe results, service records and a list of any further work found.
- Remedial work flaggedValves that fail, drift badly or cannot be reached are listed with recommended action, priced separately for your approval.
What to have ready before starting a programme
-
Your current valve list and records
Whatever exists, however patchy: old certificates, logbooks, a spreadsheet. It shows which valves have history and which start from scratch.
-
Your risk assessment and written scheme
These set the temperatures and frequencies the programme should follow, and any local requirements from a regulator or commissioner.
-
Site contacts and access rules
Who holds keys, which rooms are occupied, and any times when visits cannot happen, such as mealtimes in a care home or lessons in a school.
-
How you want records delivered
Agree how readings and service records will be returned and where they will be kept, so they are easy to produce at an inspection.
Good to know about planned maintenance
-
No law sets one frequency
The Health and Safety at Work etc. Act 1974 places duties on those in control of premises, but the frequency of TMV testing comes from your risk assessment, with D 08 Annex F a common reference.
-
Readings drive the plan
A programme should change as results come in. Valves that hold steady can be tested less often; valves that drift get closer attention or are put forward for replacement.
-
Water quality varies by region
In hard water areas such as London, the South East and much of the Midlands, strainers and cartridges scale faster and often need shorter service cycles than in soft water areas.
-
Regulators look at records
Care regulators across the four nations, and housing and licensing inspections, may ask how scald risks are controlled. A clear programme with per-valve records answers that directly.
How a programme is set up
- 1
Share your sites and records
Use the enquiry form to list the sites, roughly how many valves each has and what records already exist.
- 2
Alex arranges cover
Alex matches each site to a partner engineer covering that area, so visits are handled locally.
- 3
Scope and price agreed
The programme content, visit pattern and price are agreed with you before the first visit, along with how remedial work will be approved.
- 4
First round of visits
Valves are tested and, where due, serviced, establishing a current reading for each one.
- 5
Ongoing schedule and records
Each visit adds readings to the record and updates the forward schedule, with intervals adjusted valve by valve.
Questions about thermostatic mixing valve maintenance
How often should TMVs be maintained?
There is no single legal frequency. After commissioning tests at about 6-8 and 12-15 weeks, intervals are commonly set from drift, around 24-28 weeks for steady valves and shorter for others, with strainers checked at least annually or as your risk assessment directs.
Can valves at different sites be on one programme?
Yes. Each site is matched to a partner engineer covering that area, with the schedule and records kept together.
What happens when a valve fails a test?
It is recorded with the readings and listed with recommended action, such as repair or replacement. That work is priced and approved separately.
Do we need a survey first?
Only if you do not have a reliable list of valves. A programme can only cover the valves it knows about.
What records will we have?
You should expect readings per valve before and after, fail-safe results, service records and a forward schedule showing when each valve is next due.
How is a programme priced?
By the number of valves, the number of sites, the visit pattern and the work included. The price is agreed before the programme starts.
Services a programme draws on
- TMV testingThe in-service temperature and fail-safe tests at each valve's interval.
- TMV strainer cleaningThe routine strainer work that keeps valves responsive.
- TMV asset registersA single list of every valve, its settings and history.
- Social housingPlanned TMV maintenance across housing portfolios.
Ready to put your valves on a schedule?
Send us your sites, rough valve numbers and any records you have. Alex will arrange partner engineer cover for each site and agree the programme and price before it begins.
Send an enquiry