TMV servicing for housing associations
TMV Servicing Specialists arranges TMV servicing for housing associations, councils and other social landlords across the UK. Programmes can cover a single sheltered scheme or valves spread across a whole portfolio, with results recorded against your own property references.
Managing TMVs across social housing stock
Social landlords hold TMVs in many kinds of homes: sheltered and extra care schemes for older residents, supported housing for people with disabilities or mental health needs, adapted properties with level-access showers, and general needs homes built or converted under modern Building Regulations. Each valve protects a resident from scalding, and each needs to be found, tested and kept on a programme.
This page is for asset managers, compliance leads, repairs teams and scheme managers at housing associations, local authority housing departments, arm's-length management organisations and supported housing providers. It covers one-off visits to a scheme as well as rolling programmes across many addresses.
Where you do not have a reliable record of which homes have valves, start with a survey and asset register. For homes being adapted for a disabled resident, look at access upgrades and installation. Valves that fail tests or keep drifting move into repair or replacement.
What a social housing programme covers
Work is organised by scheme or address so results drop straight into your compliance records.
- Valve location and identificationEach valve is found, its type noted and it is matched to your property and component references.
- Temperature and fail-safe testsMixed temperatures are measured at baths, showers and basins, and each valve is checked for safe shut-off when the cold supply fails.
- Communal and scheme facilitiesAssisted bathrooms, communal kitchens and laundries in sheltered schemes are included alongside individual flats.
- Servicing and adjustmentStrainers cleaned, check valves inspected and drifted valves reset, with before and after readings.
- No-access trackingAddresses where the engineer could not get in are listed so your team can follow up and rebook.
- Register-ready resultsResults can be laid out to match the fields in your asset register or compliance system.
- Recommendations by addressFailed, missing or unsuitable valves are reported per property with the work needed.
Preparing a programme
-
Send a property list
A list of addresses or schemes, with any known valve details, lets the work be grouped into efficient visit days.
-
Write to residents early
Access letters explaining the visit, the date window and why it matters improve the number of homes reached first time.
-
Involve scheme staff
Sheltered and supported housing staff know which residents need extra notice, a carer present or a particular visit time.
-
Agree how no-access is handled
Decide how many attempts are made and who rebooks, so the programme does not stall on a few addresses.
Good to know for social landlords
-
Older residents face the highest risk
Sheltered and extra care residents may have reduced sensation or mobility. Their outlets are often treated as higher risk with lower set temperatures.
-
Regulators expect a grip on safety data
Social housing regulators in each UK nation expect landlords to know the condition of their homes and to manage safety risks with reliable records.
-
Water hardness varies across a portfolio
Homes in hard water areas such as London and the East of England tend to scale valves faster than those in Scotland, Wales or the North West.
-
TMVs and Legionella sit together
Void properties and little-used outlets in schemes need flushing and recording, as set out in HSE guidance, as well as TMV checks.
How a programme is set up
- 1
Enquiry with your property list
Use the form to describe the stock, numbers of homes or schemes and regions covered.
- 2
Alex plans the matching
Alex matches the work to partner engineers covering the areas in your list, grouping addresses sensibly.
- 3
Pricing agreed
The price depends on valve numbers, spread of addresses and reporting format, and is agreed before any visits start.
- 4
Visits to homes and schemes
Engineers attend on the dates in your resident letters and report access problems as they happen.
- 5
Results and exceptions
A programme usually leaves you with per-valve results, service records, a no-access list and a list of further work.
Social housing TMV questions
Can you work to our property references?
Yes. Send your references with the property list and results will be recorded against them.
Do you cover stock in more than one nation?
Yes. We cover England, Scotland, Wales and Northern Ireland, so a cross-border portfolio can be handled through one enquiry.
Who writes to residents?
Usually the landlord, as residents recognise your name. We can suggest what the letter should say about the visit.
What happens when residents are out?
The address is recorded as no access, with the date and time, so your team can rebook it.
How often should sheltered housing TMVs be tested?
Many landlords test at least once a year, and more often in sheltered or supported schemes where the risk assessment calls for it.
Can you start with one scheme as a trial?
Yes. Starting with one scheme lets you check the reporting format and resident letters before a wider roll-out.
Related services and sectors
Start a TMV programme for your homes
Send us an outline of your stock, the schemes or addresses involved and the regions they are in. Alex will match partner engineers and agree a price and reporting format with you first.
Send an enquiry