TMV Servicing Specialists arranges TMV commissioning across the UK for valves installed by builders, refurbishment contractors and other trades. A partner engineer checks each valve suits its setting, sets the outlet temperature, proves the fail-safe and records a baseline you can test against.

A thermostatic mixing valve with a temperature test gauge fitted to its outlet

Why fitted is not the same as finished

A thermostatic mixing valve leaves the factory with a default setting, not the setting your outlet needs. On new builds and refurbishments, valves are often fitted by the plumbing contractor and then left at whatever temperature they arrived at, with no fail-safe test and no record. The building is handed over and nobody can say what the valves are doing. Commissioning closes that gap.

It is aimed at developers, main contractors, facilities teams taking over a new or refitted building, care providers opening new rooms, schools after a washroom refit, and landlords who have had bathrooms renewed. It is also useful where a building has changed hands and the new owner has valves with no paperwork at all.

Commissioning assumes the valves are already in place and roughly right. Where outlets have no valve, installation is needed. Where valves have been in service for a while, a test or service is usually the better starting point. If the building has many valves and nobody knows where they all are, a survey first will make commissioning faster and more complete.

What commissioning covers

D 08 Chapter 11 sets out how valves are commissioned and then tested in service. The steps below follow that sequence in plain terms.

  • Suitability for the settingBefore touching the setting, the engineer checks the valve's approval and type against the outlet and its users. A TMV2 valve on an assisted bath in a care home, for example, is flagged rather than commissioned as if it were fine.
  • Supply conditionsHot and cold temperatures are measured at the valve and the supply arrangement is noted, so the valve can be confirmed as working within the conditions it is approved for.
  • Isolation and strainersThe engineer checks there is a way to isolate each supply and that strainers are present and clear. New pipework often leaves debris that blocks strainers within the first weeks.
  • Setting the outlet temperatureEach valve is set for its outlet, commonly 41°C for basins and showers, 44°C for baths and 38°C for bidets, or lower where your risk assessment says so.
  • Fail-safe testThe cold supply is isolated and the flow should stop or fall to a trickle. When it is restored, the mixed temperature should return close to the set value, commonly within 2°C.
  • Baseline recordSupply temperatures, mixed temperature and fail-safe result are written down per valve. This is the reference every later test is measured against.
  • First in-service test datesEach commissioned valve gets dates for its tests at about 6-8 weeks and 12-15 weeks, which reveal early drift before a longer interval is set.

Plan ahead of the commissioning visit

  • Water on and heating running

    The hot water system needs to be up to temperature and the cold supply live at normal pressure. A valve set while the system is still warming up will be wrong.

  • Have the as-fitted information

    Drawings, valve schedules or the installer's notes help the engineer find every valve and match it to its outlet.

  • Access to every valve

    Panels should be removable and ceiling hatches reachable. Valves sealed in behind finished tiling cannot be commissioned properly.

  • Know the risk assessment settings

    If your risk assessment calls for lower temperatures than the usual maximums, give those figures before the visit so each valve is set once.

Worth knowing about commissioning

  • Handover can happen without it

    Building completion does not always include TMV commissioning, so a new building can be occupied with valves never set or proved. Asking for the records at handover tells you quickly.

  • Debris is common in new pipework

    Swarf, flux and sediment from new installations collect in strainers. The early in-service tests often find strainers that need clearing.

  • The early tests matter

    The tests at about 6-8 weeks and 12-15 weeks show how much a new valve drifts. Where it holds within about 1°C, the interval can move to around 24-28 weeks; greater drift means shorter intervals.

  • Commissioning can find unsuitable valves

    Sometimes the right outcome is a report that a valve should be changed before it goes into use, rather than a setting on a valve that does not suit the setting.

How commissioning is arranged

  1. 1

    Tell us about the building

    Use the enquiry form to give the number of valves, the type of building, when the water will be live and any as-fitted information.

  2. 2

    Partner engineer matched

    Alex matches the job to a partner engineer covering your area who commissions valves in that kind of building.

  3. 3

    Price before the visit

    The price is agreed before work starts, based on the number of valves, access and whether any are expected to need adjustment or parts.

  4. 4

    Commissioning on site

    Each valve is checked for suitability, set, fail-safe tested and recorded, with any problems listed.

  5. 5

    Baseline and schedule

    A visit usually leaves you with a record per valve, the fail-safe results, the first in-service test dates and a list of anything that needs further work.

Questions about TMV commissioning

See all questions

Our contractor fitted the valves. Is that not commissioning?

Not necessarily. Fitting connects the valve; commissioning sets it for the outlet, proves the fail-safe and records the baseline. Ask the contractor for those records; if there are none, the valves have not been commissioned.

What is D 08 Chapter 11?

It is the part of the D 08 supplement to HTM 04-01 that describes commissioning and in-service testing of TMVs, including test intervals. It is widely used as a reference outside healthcare too.

Can commissioning happen before the building is occupied?

Yes, as long as hot water is at normal temperature and the supplies are at working pressure. That is often the best time, before outlets are in daily use.

What if a valve is the wrong type?

The engineer records it as unsuitable for the setting and explains why. Replacement can then be arranged before the outlet is used.

When is the first test after commissioning?

At about 6-8 weeks, then again at about 12-15 weeks. Those results set the longer interval for each valve.

How is commissioning priced?

By the number of valves, access and what is found. The price is agreed before any work starts.